Pre-cast concrete pile monitoring from manufacture to after installation
Acrónimo: PILE-MON Tipo de Proyecto: Investigación y desarrollo Entidad Coordinadora: BULLIVANT TARANTO LTD/UNITED KINGDOM Programa de Financiación: 7º Programa Marco Investig. Principal: BULLIVANT, Simon (Mr) Periodo de ejecución - Desde: 2008-11-01Hasta: 2010-10-31 Entidad Financiadora: Comisión Europea Presupuesto: 1,40 million euro Financiación del proyecto: 1,06 million euro Naturaleza de los Fondos: Europeo Página Web:Pre-cast concrete pile monitoring from manufacture to after installation Resumen:
Concrete piles are being used extensively in the civil construction industry, but there are a lot of issues to be addressed in the integrity testing of these piles. The most commonly used concrete piles are the pre-cast concrete piles and the cast in-situ concrete piles. Cast in-situ concrete piles are limited in the length or depth at which it could be cast unlike pre-cast piles (it can be extended to greater depths using mechanical joints). Apart from its advantage in installation depth, pre-cast concrete piles are becoming more preferred because of the decreasing length of the individual pile sections before installation. There are equipments and method available for concrete pile integrity testing that is time and cost effective (e.g. ultrasonic testing), but they have limitations especially when testing pre-cast piles. Therefore, our idea is to produce an innovative quality assurance system to enable a cost effective, efficient and reliable means of monitoring the integrity of pre-cast concrete piles through out its supply chain from manufacturing up until after its installation. The proposed project would involve the development of: - A means of recording and accessing pile information (pile number, batch number, pile location, periodic integrity check results etc) using a RFID tag on each pile; - A means of verifying a number of piles used to form a segmented pile has been properly driven (installed) into the ground and can hold a given amount of weight. This would be done by developing an innovative concrete pile manufacturing process to slightly embed a conductive circuit path through the pile common failure areas to allow current passage through the pile, which would allow for the detection of changes in resistivity due to cracks or strain to the concrete pile using a Time-Domain Reflectometry Technique. This could be a means to verify the possibility of reusing a concrete pile if the case arises.
Socios:
THE UK INTELLIGENT SYSTEMS RESEARCH INSTITUTE LIMITED/UNITED KINGDOM
NYSKOPUNARMIOSTOO ISLANDS/ICELAND
INGENOR CONSTRUCCIONES SL/SPAIN
IMKO INTELLIGENTE MICROMODULE KOHLER GMBH/GREECE
RESEAUMATIQUE SA/FRANCE
Acc. Estratégicas - DESARROLLO DE LA SEGURIDAD Y LA FIABILIDAD:
Desarrollar herramientas y metodologías para la mejora de la seguridad en las transacciones de mercancías e información entre los agentes de la cadena de suministro, así como en la movilidad de los viajeros
Acc. Estratégicas - TECNOLOGÍA:
Impulsar los avances tecnológicos en diseño de producto bajo requerimientos logísticos (envase y embalaje) y su coordinación en la gestión operativa
Investigar en nuevos modelos de negocio que fomenten la visibilidad y la trazabilidad, impulsados por las TIC y aplicados a sistemas de transporte